Tunnelling machines - Air locks - Safety requirements
GSO EN 12110:2002+A1:2011 Files
No files for this standard are available in the store currently.
Obtaining this standard through the store is currently unavailable. You can acquire it directly from its source.
GSO EN 12110:2002+A1:2011 Scope
This European Standard applies for the design, construction, equipping, marking and testing of air locks and pressure bulkheads, which are to be used in tunnelling work. The oxygen breathing installation used to provide the breathing supply necessary to conduct a safe decompression is also covered by this standard. 1.2 This standard deals with all significant hazards, hazardous situations and events relevant to air locks and pressure bulkheads, when they are used as intended and under the conditions foreseen by the manufacturer (see clause 4). This standard specifies the appropriate technical measures to eliminate or reduce risks arising from the significant hazards. 1.3 This document is not applicable to machinery which is manufactured before the date of publication of this document by CEN.
Best Sellers From Mechanical Sector
GSO 42:2015
Gulf Technical Regulation
MOTOR VEHICLES - GENERAL REQUIREMENTS

GSO 159:1993
Gulf Technical Regulation
MOTOR VEHICLES –
DIMENSIONS AND WEIGHTS

GSO 98:1988
Gulf Technical Regulation
MOTOR VEHICLES- FLAMMABILITY OF
INTERIOR MATERIALS AND THEIR
TESTING METHODS

GSO 2698:2022
Gulf Standard
Technical Requirements for Electric Vehicles

Recently Published from Mechanical Sector
GSO 1620:2002
Gulf Standard
Domestic and contact furiniture -part 4 :methods of testing tables.

GSO 198:1994
Gulf Standard
CHEMICAL ANALYSIS OF CARBON
STEEL – DETERMINATION
OF NITROGEN

GSO 376:1994
Gulf Standard
Code of practice for the inspection and testing of steam and hot water boilers -- Part 6: Periodic internal inspection

GSO 374:1994
Gulf Standard
Code of practice for the inspection and testing of steam and hot water boilers --Part4: Comprehensive procedure for thermal performance tests